Weekend Sale Special Limited Time Flat 70% Discount offer - Ends in 0d 00h 00m 00s - Coupon code: 70spcl

Salesforce Salesforce-Net-Zero-Cloud Salesforce Net Zero Cloud Accredited Professional Exam Exam Practice Test

Page: 1 / 5
Total 45 questions

Salesforce Net Zero Cloud Accredited Professional Exam Questions and Answers

Question 1

What are the two approaches for calculating scope 2 emissions associated with electricity usage? (2 options)

Options:

A.

Location-Based

B.

Energy-Based

C.

Market-Based

D.

Grid-Based

Question 2

Which data import tool can import up to 50,000 records at a time, and provides a simple interface to specify the configuration parameters, data sources, and the field mappings that map the field namesin the import file with the field names in Salesforce? (1)

Options:

A.

Data Loader

B.

Data Loading Wizard

C.

Data Import Wizard

D.

Data Importer

Question 3

Where can the sustainability manager configure their preference for scope 2 emissions? (1)

Options:

A.

Both are always active therefore simply hide the field if the client does not want to see both

B.

Define the correct Scope 2 in the Emission Factors

C.

It is selected in the Salesforce Setup under 'Net Zero Cloud-Scope 2' or 'Sustainability-Scope

D.

It is a prompt during the installation of the Managed Package

Question 4

A sustainability manager has received a file of electricity bills to import into Salesforce. What is the best way to avoid duplicating records? (1)

Options:

A.

Merge Leads Function

B.

Validation rules

C.

Insert new records with Data Loader

D.

Update/Insert records with Data Import Wizard

Question 5

A System Administrator is installing the Net Zero Cloud package from the AppExchange for the first time but is running into errors. What two issues could be causing the problem? (2)

Options:

A.

He has not been assigned the Sustainability Cloud or Net Zero Cloud Permission Set License

B.

He has not enabled Einstein Analytics in the org

C.

He has not been assigned the Sustainability Analytics Permission Set

D.

He does not have the most up to date AppExchange link

E.

He has not been assigned the Sustainability Cloud or Net Zero Cloud Permission Set

Question 6

The client can fill any energy use data gaps for commercial buildings and data centers using system estimates. The client can also enter the data manually. What user permission is required to use Data Gap Filling? (1)

Options:

A.

Sustainability Cloud or Net Zero Cloud

B.

Einstein Analytics Permission

C.

Event Monitoring Analytics Admin

D.

Sustainability App Manager

Page: 1 / 5
Total 45 questions