Question 1

Cloud Kicks has invited stakeholders from multiple departments and roles to participate in its latest Salesforce project. Each stakeholder's experiences and priorities for the project are different which causes tension within the team and a lack of clarity around project direction.

What should the business analyst do to help the team work together more effectively?

Options:

A.

Encourage leadership to share their vision for the project, and ask the larger team to focus feedback only on the key objectives, pain points, and requirements outlined by leaders

B.

Limit participation in key project discovery, requirements, and solutioning meetings to leadership. and engage the larger team to answer questions directly/ related to their roles when needed.

C.

Lead the stakeholders in creating a team agreement that assigns project roles and outlines how the team will collaborate, disagree, develop trust, and define success

Question 2

Universal Containers (UC) has low adoption rate of its Salesforce solution. UC has hired a new vendor to overhaul its documentation and train) ng process. needs a business analyst to facilitate this transition.

Which of set if actions are the most effective business needs from stakeholders?

Options:

A.

send surveys to collect feedback; observe end 'Users; whiteboard incoming requests; and store communication in a centralized location.

B.

Mock up a design; build a prototype; demonstrate functionality to end users; and collect feedback for Changes.

C.

Use multiple forms of communication; build trust; show empathy; and get commitment for next

Question 3

The business analyst (BA) at Cloud Kicks is managing a project to build a recruiting app for the management and human resources (HR) teams. The HR director wants the app to help the team navigate the hiring process more efficiently. The BA designs a Stakeholder Wheel to better understand all of the people with an interest m the project.

Which level of influence should the BA place the MR Director on the stakeholder wheel?

Options:

A.

The Sponsor

B.

The Enterprise

C.

The project

Question 4

Northern Trail Outfitters (NTO) wants to address a recent group of complaints it received from the service team The NTO Salesforce team was alerted Chat the current routing process is preventing cases from reacting the correct service team without manual intervention.

Which action should the business analyst take to best understand and document the and recommend a future state?

Options:

A.

Organize a brainstorming session with service team leadership.

B.

Engage in a live process modeling exercise with the service team.

C.

Review individual surveys and questionnaires from the service team.

Question 5

Universal Containers is transitioning to Slack as its internal communication tool and is ready to release.

What is the final step that a business analyst should perform during the user acceptance testing process that would ensure a "go" decision?

Options:

A.

Complete development on bugs discovered during this phase.

B.

Get written sign-off from all business stakeholders.

C.

Conduct a final retrospective meeting with the project team.

Question 6

The business analyst (BA) At universal Containers is writing user stories for its Salesforce Field Service implementation.

What should the BA evaluate to understand the understand the risk level of the user stories?

Options:

A.

Scope, resource, and documentation impact

B.

Team, budget, and timeline impact

C.

Technical, operational, and regulatory impact

Question 7

The business analyst at Northern Trail Outfitters receives a requirement from the CRM manager to have visibility into their team's queues to monitor open cases.

Which user story meets this requirement?

Options:

A.

As a CRM manager, I need a record-triggered flow to view my team's work queues so 1 can monitor their open tickets.

B.

As a CRM manager, I need to see my team’s work queues so I can monitor their open tickets.

C.

As a user, I need to see case queue to monitor my team's work.

Question 8

A business analyst (BA) discovers that universal Containers automated case assignments in Service Cloud. UC uses case assignment rules to route cases to predefined team. The UC leadership team wants to improve how cases are routed.

What should the BA recommend to help the resolve a common obstacle?

Options:

A.

Minimize case escalations to reduce time to resolution.

B.

Migrate from case assignment riles to Omni-Channel.

C.

Document the current case assignment process.

Question 9

During a sprint grooming session for the Sales Cloud implementation at Cloud Kicks, the development team mentions the step "Code Review by Technical Architect" listed within the acceptance criteria needs to be adjusted.

Which location should the business analyst move this item to?

Options:

A.

Project plan

B.

Definition of done

C.

Pull request template

Question 10

The business analyst is auditing data access by documenting Field-level Security on the Account object in Salesforce.

How do end users participate as stakeholders in data Governance?

Options:

A.

They export their data back it up locally.

B.

They implement their data entry workarounds in the system.

C.

They provide valuable feedback on how they use data.

Question 11

Cloud Kicks (CK) has expressed concerns about the distribution process for a new line of shoes, because the company consistently misses its targeted delivery dates. CK asks the business analyst (BA) to uncover the issue and propose a business solution.

What should the BA do next?

Options:

A.

Review future state distribution processes for CK.

B.

Explore how retailers similar to CK handle distribution.

C.

Shadow an operations team member at the CK distribution facility.

Question 12

Sales managers at Northern Trail Outfitters (NTO) have received feedback from sales reps that record pages are slow and often take longer to load when using the app on the phone. The business analyst (BA) has been asked to evaluate NTO’s org to find out which pages are the slowest to load when using the app on the phone.

What is the first step the BA should take to help resolve the issue?

Options:

A.

Create a new page layout for the phone.

B.

Use performance analyzer to view the assessment.

C.

Confirm steps to reproduce the issue.

Question 13

The sales team is learning a new sales methodology. Management wants to align Salesforce opportunities with the methodology.

What is the first step a business analyst should take to begin overhauling the Opportunity object?

Options:

A.

Understand the current business process.

B.

Configure stages in Salesforce.

C.

Create new reports and dashboards.

Question 14

The executive director of Universal Containers (UC) plans to purchase additional Salesforce Iicenses. The director recently hired a business analyst (BA) to lead a series of journey mapping sessions. The director wants the Journey mapping sessions to be tailored to the features and capabilities that are currently available in UC’s Salesforce environment.

Which information does the BA need to determine the features and functionality UC can implement while avoiding additional costs?

Options:

A.

Organization edition and license type

B.

Storage capacity and license type

C.

Number of active users and license type

Question 15

The sales team at Universal Containers (UC) has been using multiple tools to track opportunities, leading to inaccurate forecasting and an unclear picture of UC's sales pipeline. UC has appointed a project team to implement Sales Cloud to help resolve these issues. TTie sales team doubts the new tool will meet their needs and is concerned it will be difficult to use. The business analyst (BA) assigned to the project knows the stakes are high to get the right solution in place.

Using their influence, what should the BA do to gain the necessary buy-in and support from the sales team to ensure a solution meets the requirements?

Options:

A.

Ask questions to understand their needs and focus on shared goals.

B.

Present the pros and cons of the decision by using logic and facts.

C.

Demonstrate the BA's expertise and clearly state the decision is final.

Question 16

The business analyst (BA) at Universal Containers (UC) wants to understand why UC failed to meet a deployment date for its product go live while following the Agile process. According to the BA's research, the developers lacked a sense of the work in progress and the intended goal of that work, and the QA team was unable to clearly test the functionality based on a given persona.

Which step should the BA take next?

Options:

A.

Create a SWOT (Strength, Weakness, Opportunity, Threat) analysis to understand why development and testing took more time.

B.

Move the deployment date out so the teams have more time to work.

C.

Review the user stories to ensure they are small, testable, and valuable.

Question 17

Historically, Cloud Kicks (CK) has been a B2C company. CK now wants to add a B2B line of business. Sales leadership at CK has asked the business analyst (BA) how this will impact its existing and future Salesforce configuration.

Where should the BA focus the initial impact analysis?

Options:

A.

Einstein Forecasting

B.

Person Accounts

C.

Lead Processes

Question 18

Universal Containers is implementing a Salesforce solution that’s designed to transform its customer service division. During sprint planning, it was determined that the development team would be able to successfully deliver all remaining work items. However, due to unplanned delays, the development team is now at risk of being unable to complete the work items.

Question # 18

The project manager has asked for the business analyst’s (BA) help to prioritize the remaining work items. The development team has 16 hours of capacity remaining and is focused on launching a minimum viable product (MVP) of the customer service solution as soon as possible.

Which work items should the BA prioritize with the remaining 16 hours of development capacity?

Options:

A.

US-4008 and US-4009

B.

US-4007 and US-4009

C.

US-4009 and US-4010

Question 19

Northern Trail Outfitters is starting a project to implement Service Cloud for the customer service department.

Which activity should be handled by a business analyst assigned to this project?

Options:

A.

Work with Salesforce to purchase the necessary licenses.

B.

Manage existing Salesforce applications and activities.

C.

Understand current business processes and document existing functionality.

Question 20

Northern Trail Outfitters (NTO) is working with an implementation partner to transform its customer support team with Service Cloud. A new business analyst (BA) who is a replacement from the partner was introduced to NTO stakeholders during the discovery phase of the project. The new BA is still getting to know each of the stakeholders when they start the requirements workshop. The BA asks a stakeholder a discovery question and they seem irritated.

What should the BA do to build trust with the stakeholder as the project continues?

Options:

A.

Set up a casual meeting to create a personal connection with the stakeholder.

B.

Reset project expectations at the next meeting with the stakeholder.

C.

Ask an executive sponsor to address the stakeholder's concerns.

Question 21

Cloud Kicks (CK) recently decided to transition its business from spreadsheets to a Salesforce solution. CK leaders are excited about the capabilities of Salesforce. Each leader has different ideas about how the platform should be implemented. CK has hired a business analyst (BA) to help define and manage the implementation.

What should the BA do in the first discovery meeting with stakeholders?

Options:

A.

Collaborate with stakeholders to examine and define CK's purpose, customers, metrics, and overall business to inform project direction and vision.

B.

Discuss and document specific pain points in existing processes to inform future project requirements.

C.

Preview potential Salesforce solutions and collect feedback from stakeholders on each option to inform the direction of the project.

Question 22

Which step should a business analyst take to establish a connection with stakeholders during discovery sessions for a new Experience Cloud site?

Options:

A.

Highlight their related Salesforce certifications to showcase expertise.

B.

Share insights empathetically based on prior work that has solved similar problems.

C.

Ensure the workshop schedule considers time zones and language differences.

Question 23

In what phase of the four application lifecycle milestones does this action belong? Communicate Changes, Update Profiles and Communicate end of Changes.

Options:

A.

Build

B.

Deploy

C.

Test

D.

Plan

Question 24

The sales team recently received training on a new sales methodology. When viewing an Opportunity in Sales Cloud, the sales manager wants the sales cycle to include new stages in addition to multiple custom fields. The business analyst is starting to construct user stories to support the new process.

What should each user story include?

Options:

A.

Value, purpose, and need

B.

Who, what, and why

C.

Who, where, and how

Question 25

After completing requirements gathering session for a Sales Cloud implementation, the business analyst (BA) has started to write user stories. During an internal user story grooming session, the project manager decided that each user story must:

* Be assigned a level of effort

* Be demonstrated to the stakeholder

* Have documented deployment steps

Where should the DA capture these requirements?

Options:

A.

Definition of done

B.

Assumptions

C.

Acceptance criteria

Question 26

Universal Container wants to build a Salesforce application to manage its recruitment lifecycle. The project lead wants to identify the key recruitment steps and stakeholders in a visual format.

What should the business analyst do to meet the requirement?

Options:

A.

Map the business process.

B.

Review department procedures and consult the org chart.

C.

Create an entity relationship diagram.

Question 27

The Business analyst (BA) at Universal Container wants to improve the case process in Salesforce after feedback customer abut resolution time.

The BA tacks the user story, request details, and configuration changes in a repository.

What is a benefit of tracking user stories in this way?

Options:

A.

Multiple project team members can make and view revisions.

B.

It links all changes to Salesforce metadata.

C.

The development team can work parallel on the same requirement.

Question 28

Universal Containers (UC) uses a Salesforce org. UC is merging with a sister company that uses a different CRM. The incoming sales team is reluctant to change to a different process. The business analyst (BA) has been asked to help reach consensus and drive adoption.

Which group is well positioned to help the BA secure alignment for the initiative?

Options:

A.

System admin and project manager

B.

Power users and top sales earners

C.

Executive sponsors and sales leadership

Question 29

Northern Trail Outfitters (NTO) plans to significantly grow its workforce and wants to increase the overall security of its Sales Cloud instance. NTO has previously implemented a complex security solution with organization wide defaults, criteria-based sharing rules, and dozens of user profiles. NTO has asked a business analyst (0A) for recommendations on how to proceed.

Which aspect of a potential solution is most important for a BA to consider?

Options:

A.

User adoption

B.

Scalability

C.

System downtime

Question 30

A business analyst (BA) at Northern Trail Outfitters (NTO) is assigned to a project to help revamp n process. The current process used by the sales team is different than the process outlined in NTO’s documentation.

Which step should the BA take first?

Options:

A.

Create an Entity Relationship Diagram (ERD) of the current state.

B.

Meet with stakeholders as a group to capture future requirements.

C.

Meet with stakeholders as a group to understand the current state.

Question 31

As a business analyst (BA) starts engaging stakeholders for a user story writing workshop, an executive sponsor questions why the Commerce Cloud project is creating user stories rather than standard requirements.

What is one benefit of creating user stories that the BA can share with the executive sponsor?

Options:

A.

It defines technical specifications early in the process.

B.

It helps testers determine the most efficient way to validate solutions.

C.

It saves time when prioritizing and implementing functionality.

Question 32

The customer service director at Universal Containers wants a self-service portal for customers using Experience Cloud. The director has a limited budget and wants the solution delivered before the end of the quarter.

After assessing several potential options, which solution should the business analyst recommend?

Options:

A.

The solution with the lowest cost

B.

The solution with the fastest implementation time

C.

The solution with the highest business value

Question 33

Universal Containers has a new client, and the business analyst wants to leverage customer-centric discovery to ensure a successful project outcome.

Which step of this process happens before the first requirements workshop?

Options:

A.

Be Your Customer

B.

Know Your Customer

C.

Connect With Your Customer

Question 34

The sales team at Universal Containers has concerns that the process for distributing new leads is too slow. The VP of sales has engaged a business analyst (BA) to help map out a process to distribute new leads quickly. The BA sets up a meeting with stakeholders and learns a stakeholder already has a solution in mind.

What should the BA do next?

Options:

A.

Implement the solution now to save time in the planning phase.

B.

Ask the stakeholder to demo their solution to the project team.

C.

Gather requirements and then note the proposal solution.

Question 35

Universal Containers has just been notified by authorities that govern the shipping industry of new regulatory requirements. To comply, they are several existing processes built on Salesforce that will need to change. A business analyst (BA) will help describe the additional business needs imports by the new regulations.

Which type of document should the BA prepare?

Options:

A.

Audit log

B.

Current state analysis

C.

Gap analysis

Question 36

An executive stakeholder at Northern Trail Outfitters (NTO) wants to explore automating NTO’s Quote-to-Cash process and has asked the business analyst (BA) to pull together some high-level information on possible solutions.

Which type of document should the BA present to the stakeholders?

Options:

A.

A capability map detailing the functionality of Salesforce and AppExchange Quote-to-Cash products

B.

A SIPOC (Support inputs, Process, Outputs, and Customers) map outlining the Quote-to-Cash process

C.

A business process map detailing the existing step-by-step Quote-to-Cash process

Question 37

A Cloud Kicks business analyst (BA) is conducting user interviews with the support team as part of a migration to Salesforce.

Several users indicate they use multi-factor authentication (MFA) on their phones to log in to existing systems. Other users have indicated they access existing systems with only a username and password.

How should the BA resolve the issue?

Options:

A.

Determine the most commonly used process.

B.

Ask the security team to confirm company policy.

C.

Ask executive leadership to make the decision.

Question 38

The sales team at Cloud Kicks is rolling out a new sales methodology. To incorporate the requested changes, the business analyst working with the technical team identifies several integrations that touch the Opportunity object and could be impacted by the changes. The project manager wants the solution to include unit testing, code reviews, and functional testing.

What does the project team need to agree upon to ensure the work is ready to be deployed?

Options:

A.

Entity relationship diagram

B.

Definition of done

C.

User acceptance criteria

Question 39

A business analyst (BA) at Universal Containers (UC) has been asked to evaluate a business process at a high level and in detail, while also keeping regulatory considerations in mind. Management wants to use the output from the BA's evaluation to inform decisions about UC's future implementations of Sales Cloud and Service Cloud.

What should the BA use for their evaluation?

Options:

A.

Cross-functional flowchart

B.

Entity Relationship Diagram (ERD)

C.

Universal Process Notation (UPN)

Question 40

A business analyst (BA) is compiling a list of subject matter experts to consult throughout the discovery for a new Service Cloud implementation.

What is the primary value of the BA speaking with customer service reps?

Options:

A.

Validating current processes

B.

Estimating the project cost

C.

Building solution design consensus

Question 41

Cloud Kicks (CK) needs to implement an event management system within Salesforce. After researching potential solutions, a managed package meets the majority of CK s business requirements. However, the CRM director has expressed a desire to heavily customize an open source solution.

Which benefit of using a managed package versus an open source solution should the business analyst share to help the CRM director make a decision?

Options:

A.

Managed packages are easily customizable to meet CK's exact requirements.

B.

Managed packages are updated automatically with each Salesforce Release.

C.

Each version of a managed package on the AppExchange undergoes a security review.

Question 42

Cloud Kicks (CK) wants to Improve the current business process for moving orders from the warehouse to the customer as part of a Commerce Cloud Implementation. The business analyst would like to gather more Information to create the future state process.

Who is the most appropriate subject matter expert (SME) to confirm the current business process and elicit deeper understanding of CK's goals, opportunities, and pain points?

Options:

A.

Sales manager

B.

Chief financial officer

C.

Supply chain manager

Question 43

The business analyst (BA) at Cloud Kicks is deep in planning activities for its Commerce Cloud implementation project. The project sponsor asks the team to adjust their efforts due to budgetary constraints.

What should the BA do next?

Options:

A.

Organize requirements.

B.

Validate requirements.

C.

Prioritize requirements.

Question 44

A new employee at Universal Containers just sent the business analyst (BA) a Slack message with an named User3tories_v37_final_final_final.docx.

Which best practice should the 6A train the employee on first?

Options:

A.

Use standard naming conventions.

B.

Use acceptance criteria to define success.

C.

Use a version control repository.

Question 45

A business analyst (BA) uncovered a number of issues communicated by stakeholders in a Sales Cloud discovery session.

Which issue should concern the BA most?

Options:

A.

The previous implementation partner neglected to do a knowledge transfer of the final solution.

B.

The support organization still needs to be trained on how to use Sales Cloud.

C.

The system admins note a fair amount of technical debt without having the time or expertise to address it.

Question 46

Cloud Kicks needs to revamp its support process to improve the customer experience and has asked the Service Cloud team to collaborate with the business analyst (BA). The BA has scheduled an initial live process mapping session with all stakeholders and received the following calendar responses:

Question # 46

What should the BA do?

Options:

A.

Hold a one-on-one diagram session with each stakeholder before the workshop.

B.

Proceed with the workshop as scheduled with the stakeholders who are available.

C.

Cancel the workshop and reschedule it to a date when ail stakeholders ace available.

Question 47

Northern Trail Outfitters (NTO) has completed a project with a third-party event organization platform to enhance its MVP Experience Site. Many features were left in the project backlog. NTO's IT team is beginning a new phase of work on the Experience Site to build additional features requested by business stakeholders and wants to include the items that were left in the backlog in the first phase.

How should the business analyst coordinate the user stories to most efficiently manage the new project timeline?

Options:

A.

Include existing and new user stories to be completed within the duration of the project. Hire additional developers to accommodate both work streams to prevent delays within the schedule sprints.

B.

Reprioritize existing and new user storks to place the stories into each sprint of the project. Return an equivalent: amount of lower priority work to the project backlog,

C.

Prioritize user stories for the new enhancements for the initial sprints of the project to accommodate business stakeholder requests. Complete existing user stories in the final sprint of the project.

Question 48

Cloud Kicks has decided to implement a case management process through Service Cloud. A business analyst (BA) has been tasked with writing requirements for this new feature.

Which process should the BA follow to draft and finalize the requirements?

Options:

A.

1. Review information from the discovery.2. Ask clarifying questions.3. Draft requirements.4. Share requirements with the technical so they can begin building.5. Create user acceptance criteria and test cases.

B.

1. Review information from the discovery.2. Draft requirements.3. Ask clarifying questions.4. Draft user stories.5. Share user stories with the technical team so they can begin building.

C.

1. Review information from the2. Ask clarifying questions.3. Draft requirements.4. Refine and confirm requirements.5. Prioritize which requirements will be included in the minimum viable product.

Question 49

During a requirements gathering session, two stakeholders discuss the names of the fields they want to see when adding leads to the system. Each stakeholder has a different point of view on field names.

What should the business analyst do to help Influence the team and accurately capture the requirements?

Options:

A.

Find a middle ground where both stakeholders are satisfied with the field names.

B.

Ask the executive sponsor to make the final field name decisions.

C.

Allow the development team to make the final field name decisions.

Question 50

The leadership team at Universal Containers (UC) is focused on customer retention. The business analyst (BA) has been asked to implement a new customer for life program on the salesforce platform. Before their can move forward, they need to understand the lifecycle and all of the related interaction that IC has with its customers.

Which type of session should the BA perform?

Options:

A.

User Acceptance testing

B.

Journey Mapping

C.

Requirements Gathering

Question 51

The Salesforce delivery team at Cloud Kicks consistently has user stories that developers start but are unable to complete during each sprint. During the most recent retrospective, the development team expressed that they are running out of time to complete the stories. The team used the INVEST checklist to diagnose why these stories are incomplete at the end of the sprint.

Which checklist item is the most likely reason why the stories are incomplete at the close of the sprint?

Options:

A.

Negotiable

B.

Valuable

C.

Small

Question 52

During a Service Cloud implementation at Cloud Kicks, the business analyst (BA) reviewed the user acceptance testing and identified results that conflict with the functionality that was requested, While the testing was error-free, business stakeholders indicted that values in reports and the layout of screens were unexpected.

What should the BA do next?

Options:

A.

Run testing again, ensuring the scripts reflect expectations and business processes match functionality,

B.

Decompose and model the business processes, and identify testing procedures to calculate new values.

C.

Present recommendations from testing to determine if improvements should be made to the underlying implementation.

Question 53

While working on a new Sales Cloud feature request for the sales team at Northern Trail Outfitters, the business analyst (BA) uncovers a workflow which could have an impact on the service team. The sales director assures the BA that the impact to service would be minimal.

Which step should the BA take next?

Options:

A.

Review the effort and impacts with the service team, and work to align requirements across the teams.

B.

Continue with the effort as defined by sales and add a backlog item to review the service impacts in the future.

C.

Prioritize the effort as defined by sales and ask the director to review any service impacts. .

Question 54

A cloud Kicks business analyst (BA) is conducting user interviews with the support team as part of a migration to Salesforce. Serval users indicate they use multi-factor authentication (MFA) on their phones to log in to existing systems. Other users have located they access existing systems with only username and password.

Options:

A.

Select the requirement used by the majority of the support team.

B.

verify the requirement with the security team.

C.

Bring the requirement to the product owner’s attention.

Question 55

Northern Trail Outfitters is undergoing a service Cloud implementation and has decided to use the Scrum methodology for the implementation. A business analyst (BA) received an urgent, high-priority change request in the middle of a sprint.

Which step should the BA take next?

Options:

A.

Begin working on the change request as soon as the team has capacity.

B.

Add the change request to the prioritized for the next sprint.

C.

De-prioritize some user stories and add the change request to the current sprint.

Question 56

What is used to declaratively move metadata from one environment to another?

Options:

A.

Data Loader

B.

Change Sets

C.

Import Wizard

D.

Ant Migration

Question 57

Universal Containers has asked a business analyst (BA) to assist the sales management team with a request for a new picklist field called "Lost Reason" on the Opportunity object with the goal of improving pipeline reports. After mapping the managers to the sales leader persona and obtaining feedback from them, the BA has discovered that the managers want to better understand Closed/Lost Opportunities so they can help sales teams close more deals.

Which option should the BA use to construct the user story?

Options:

A.

As a sales leader, I want to see more details on Closed/Lost Opportunities so I can help the sales team improve close rates.

B.

As a sales team member, I need additional enablement training and reporting information to helpthe improve close rates.

C.

AS a sales leader, I need a new "Closed/Lost Reason" picklist field on Opportunities and better reports to help the sales team improve close rates.

Question 58

After stakeholders formally signed off on requirements, the business analyst (BA) received numerous emails requesting changes to Salesforce during uses acceptance testing (UAT). The BA quickly became overwhelmed by the requests and needs a way to organize and peritonitis them.

What should the BA use to help them organize these requests?

Options:

A.

Change request log

B.

Scope statement specification

C.

Gap analysis document

Question 59

Universal Containers wants the ability to fill out a survey based on customer feedback. The team is unable to visualize a possible solution in order to confirm the requirements.

Which elicitation technique should the business analyst use to help the team meet its goal?

Options:

A.

Prototyping

B.

Brainstorming

C.

Observation

Question 60

During a project kick off for a multi-year transformational Sales Cloud project at Universal Containers, the business analyst (BA) heard the executive team discuss the challenges that the sales team Is having with their legacy solution: opportunity funnel, data hygiene, and forecasting Issues. However, the level of detail shared about the challenges was very limited.

What should the BA do next?

Options:

A.

Clone the features of the legacy solution within the new Sales Cloud org.

B.

Start writing epics and user stories that discuss the challenges mentioned.

C.

Schedule a ride-along with the sales team to learn more about their goals.

Question 61

What is the storage of the Developer Pro Sandbox?

Options:

A.

300MB

B.

200MB

C.

2GB

D.

1GB

Question 62

Cloud Kicks (CK) wants to incorporate a credit check process to verify prospects in Sales Cloud. CK asks the business analyst (BA) to identify which stage of the sales process that the credit check should be embedded.

What should the BA do to meet the requirement?

Options:

A.

Create a process map.

B.

Create a capability model.

C.

Create a value stream map.

Question 63

A new business analyst (BA) Just started working at Northern Trail Outfitters (NTO). The BA has been tasked with Implementing Service Cloud for NTO's Internal support team.

Which information should the BA gather during the Initial discovery meeting?

Options:

A.

Contact information for key stakeholders

B.

Employee review cycle for the support team

C.

Limitations of the current support process

Question 64

Northern Trail Outfitters follows an Agile methodology for its Marketing Cloud projects. The project team creates several types of documents.

Which document should a business analyst use to. capture the software and behavioral requirements of the application?

Options:

A.

Scope statement specification

B.

Functional requirements specification

C.

System requirements specification

Question 65

Universal Containers recently launched a solution that leverages Service Cloud for its North America (NA) customer support team. Planning has started for the second phase of the project which will expand the solution to include the Asia Pacific (APAC) customer support team. The APAC readership team has indicated that its processes are similar to the NA team. The APAC team wants to see the high-level process areas that were used for the NA team so it car scope the key priorities for the overall business. The business analyst (BA) has scheduled a meeting with the APAC team. ,

Which action should the BA take during the meeting?

Options:

A.

Share individual user stories from the NA implementation.

B.

Review the capability model from the NA Implementation.

C.

Demo the end-to-end solution from the NA implementation.

Question 66

Universal Containers has chosen to leverage Experience Cloud to create an engaging site for its customers. The business analyst (6A) leading this project needs to validate that the requirements meet the goal.

What should the BA do to ensure alignment?

Options:

A.

Survey customers to confirm whether the new site meets their requirements.

B.

Circulate the requirements to stakeholders, incorporate feedback, and obtain sign-off.

C.

Conduct a white boarding session to ensure the requirements are accurate.

Question 67

At the start of a new Agile development project, the Universal Containers' product owner asked the business analyst (BA) to clearly define the intended results of the work based on stakeholder needs. The development and implementation teams will use the intended results to plan product decisions. The definition should avoid assumptions and focus on stakeholder value.

Which element should the BA choose to define the intended results?

Options:

A.

Requirements

B.

User stories

C.

Epics

Question 68

A sales manager at Universal Containers (UC) customized all of their list views on the Account object to include a new field. Although they have multiple list views. The sales manager prefers to keep the recently viewed list as their default list. When the manager realize they are unable to modify the recently viewed list, they reach out to UC’s Salesforce team for help?

What are the next steps the business analyst should take?

Options:

A.

Recommend that the user submit a ticket related to the field creation.

B.

Research AppExchange solution that offer customization options.

C.

Document the desired outcome and research the impact of making a change.

Question 69

Cloud Kicks (CK) is expanding and has many different departments in manufacturing and delivery. CK needs to prepare for a new Sales Cloud implementation for it, 6,000 users. To increase adoption, the business analyst (BA) wants to break down existing sides between the manufacturing and delivery departments.

Which planning approach should the ISA take to get buy-in from users?

Options:

A.

Recombined clear owners up for the platform and identity executive sponsors.

B.

Assign a team to start building a prototype of product functionality.

C.

Document user requirement from each department during discovery sessions.

Question 70

A business analyst (BA) at Cloud Kicks has been tasked with preparing for requirements gathering workshops for an upcoming Sales Cloud implementation.

Which documentation is mast beneficial for the BA to define the scope of the project?

Options:

A.

Detailed Process Map

B.

Value Stream Map

C.

Suppliers. Inputs, Process, Outputs, Customers (SIPOC) Map

Question 71

A business analyst (BA) is reviewing the risks associated with a proposed solution leveraging Cases and Support Queues, and the effect that those risks might have on the project timeline.

Which type of analysis is the BA performing?

Options:

A.

Enterprise Analysis

B.

Strategy Analysis

C.

Stakeholder Analysis

Question 72

A business analyst (BA) at Universal Containers had a meeting with sales and service reps to gather requirements around contact management for a new Salesforce implementation. A sales rep wants a place to capture the names of the contact's spouse and children to help build the relationship. The BA writes the following user story.

"As a user, I need to be able to record a contact's title and role as separate data points so I know who to address for various needs of the account.’’

Who should be listed as the persona?

Options:

A.

Sales rep

B.

Contact

C.

Service rep

Question 73

From where can an Admin unlock a user?

Options:

A.

Setup > Locked Users > Unlock

B.

Users > Select user > Unlock

C.

Setup > Object Manager > Users > Select User > Unlock

D.

Users > Logins > Unlock Users

Question 74

The Business analyst (BA) at Northern Outfitters (NTO) has gathered preliminary functional requirements for an upcoming Salesforce implementation project. Before translating these requirements into user stories, the BA wants to gain additional perspective, feedback, and detail on the requirements from the NTO team.

Which document should help the BA gather this information?

Options:

A.

Stakeholder analysis

B.

Business analysis plan

C.

Current state analyst

Question 75

The finance team is rolling out a new sales process in Sales Cloud for opportunities that are Closed/Won. After meeting with the team, a business analyst (BA) realizes that several requirements for the new process will need further refinement.

What should the BA use to keep track of changes to the process documents?

Options:

A.

Communication template

B.

Business backlog

C.

Version control

Question 76

Which Information should the BA gather during the initial discovery meeting?

Options:

A.

Employee review cycle for the support team

B.

Limitations of the current support process

C.

A Contact information for key stakeholders

Question 77

The project manager for a new project at Northern Trail Outfitters (NTO) wants the business analyst (BA) to obtain alignment on goals and strategies across NTO's organization, using NTO's documentation, the BA begins to understand NTO's strategies but needs more information.

Which methodology should help the BA obtain the required information?

Options:

A.

V2MOM (Vision. Values, Methods, Obstacles, Measures)

B.

RACI (Responsible, Accountable, Consulted, Informed)

C.

SMART (Specific, Measurable, Achievable, Relevant, Time-bound)

Question 78

The business analyst (BA) at Universal Containers needs to gather information for their project including the steps a user takes to accomplish a goal, challenges a user faces, people the user interacts with, applications they use to complete the steps, and their level of morale as they move through the process.

Which elicitation technique should the BA use?

Options:

A.

journey Mapping

B.

Survey /Questionnaire

C.

Focus Groups

Question 79

Universal Containers is setting up a Salesforce email integration for the sales team. Through discovery conversations, the business analyst (BA) learns the operations team also needs email integration in the near future.

What should the BA do next?

Options:

A.

Proceed with the sales team's project as planned.

B.

Start project work for the operations team.

C.

Include the operations team during discovery.

Question 80

Universal Containers (UC) stores information about its containers in the standard Salesforce Product object. UC deals with data integrity issues, such as the Container Color field fails to update on all containers when the color is updated on a Container Product Line. The project owner mentioned that a previous consultant recommended that UC move to a more normalized data model to represent its containers.

What should the business analyst review to learn more about the previous consultant's recommendation?

Options:

A.

Entity Relationship Diagram (ERD)

B.

System requirements specification

C.

Change request logs

Question 81

The North American (NA) sales team wants to add a set of new fields and delete several fields from the Account object. During requirements gathering, the business analyst (BA) discovers the fields are actively being used by the EMEA team.

Which step should the BA take next?

Options:

A.

Refine the requirements to accommodate, both teams.

B.

Focus on the NA team's requirements.

C.

Start another project to address the EMEA team's requirements.

Question 82

Cloud Kicks is a rapidly growing company and has just expanded its team to include a business analyst (BA). The IT directory has asked the BA to use application Lifecycle Management (ALM) for all Salesforce development projects.

Which step of the ALM cycle requires the BA to study current business process gather requirements, and analyze them?

Options:

A.

Test

B.

Plan

C.

Build

Question 83

Northern Trail Outfitters wants to reduce the amount of time it takes for customers to receive their orders after making an online purchase.

Which initial steps should the business analyst take to help determine why the order management and fulfillment process is slow?

Options:

A.

Work with stakeholders to identify relevant processes, select a key process with defined start and end points, and collaborate with process owners and users to create a current state process map.

B.

Conduct interviews with stakeholders in the order management and fulfillment departments to identify individual pain points and brainstorm process improvement solutions.

C.

Create a process map that includes detailed steps related to order management and fulfillment, analyze the process map for inefficiencies, and present findings to leadership.

Question 84

A business analyst (BA) at Northern Trail Outfitters is preparing for a user acceptance testing (UAT) session for a global Sales Cloud project.

What should the BA do to engage the business most effectively during UAT"?

Options:

A.

Hand or ownership for writing, reviewing, and executing UAT scenarios, providing feedback, and approval for release to business stakeholders.

B.

Work with quality assurance analysts to collaborate in writing, reviewing and executing UAT scenarios, providing feedback, and approval for release.

C.

Work business stakeholders to collaborate in writing, reviewing, and executing UAT scenarios, providing feedback, and approval for release.

Question 85

A business analyst JBA) for Northern Trail Outfitters (NTO) is reviewing the business backlog and determines that many of the requirements would require custom code that is expensive and hard to maintain. The BA knows that the backlog should be prioritized by people who have knowledge of the features and functionary of the Salesforce Platform.

Who should own the process of prioritizing the business backlog?

Options:

A.

The third-party implementation team, with support from the internal technology teams affected by the project who understand NTO's vision and strategy

B.

The business teams affected, with support from the internal technology teams who understand ways to maximize Salesforce’s declarative features

C.

The project manager, with support from the third-party implementation and business teams who understand both platform and business priorities.

Question 86

A business analyst (BA) sees that all the acceptance criteria they wrote for an upcoming project go live have passed unit testing.

How can the BA support the protect team to ensure the solution meets the business's needs before demoing it to the relevant stakeholders?

Options:

A.

Collaboration with stakeholders to establish to rollout communication and training plan.

B.

Help conduct user acceptance testing to make sure the product works smoothly across all business processes.

C.

Prepare documentation to summarize the QA team’s test results for the business stakeholders.

Question 87

Over the past month, a business analyst (BA) has worked with various stakeholders at Cloud Kicks to document requirements for an upcoming Tableau implementation. A stakeholder suggested a revision to the requirements. The BA sent the updated requirements to the stakeholders and they signed off.

Where should the BA track this milestone?

Options:

A.

Statement of work

B.

Change log

C.

Sprint plan

Question 88

The sales teams at Universal Containers (UC) want to add a custom field to a page layout. The IT manager reminds the business analyst (BA) that UC uses the Application Lifecycle Management (ALM) process. The addition of the custom field and subsequent release to everyone in the organization must follow this process.

What is the first step in the ALM process that should be taken?

Options:

A.

Gather requirements and analyze them.

B.

Obtain a change order from the customer.

C.

Add a custom field to a page layout in a sandbox.

Question 89

New interns at Universal Containers have been tasked with following a new process to import leads from a spreadsheet into Salesforce. A business analyst is mapping the process to document the overall lead creation process.

What should the process map look like?

Options:

A.

A very detailed process map that is unambiguous and version controlled

B.

A somewhat detailed process map that is easy to remember and self- explanatory

C.

A simple process map that is high-level and covers key aspects

Question 90

Universal Containers is in the discovery phase of a new Service Cloud project. The lead business analyst (BA) review user stories written by junior Bas. The lead BA discovers these user stories are missing details, as how case routing should work. The lead BA asks the junior Bas to make revisions based on the intended audience for the user stories.

Options:

A.

End user and development team

B.

Development and QA teams

C.

Business user and QA team

Question 91

Universal Containers has planned an initiative to assess its Salesforce org to identify areas of risk and has asked the business analyst (BA) to provide an analysis of its current state. The BA will utilize Salesforce Optimizer for the assessment.

How should the BA use the output from the tool?

Options:

A.

Understand the project scope.

B.

Verify Lightning page loading time.

C.

Identify top project priorities.

Question 92

Universal Containers is focused on an initiative to streamline its channel management processes. Due to the level of complexity, the business analyst (BA) will gather and document the key points in preparation to build a more detailed process map.

Which diagram should the BA use in this case?

Options:

A.

SIPOC (Suppliers, Inputs, Process, Outputs, Customers)

B.

Capability Model

C.

Value Stream Map

Question 93

Universal Containers recently kicked off a project to build an Experience Cloud solution for partners. Partners need to upload their monthly sales reports to this account portal.

Which option should the business analyst use as the functional requirement specification?

Options:

A.

Partners need to submit monthly sales reports.

B.

The portal should allow for partners to upload monthly sales reports.

C.

The portal should allow for partners to access monthly sales reports.