Which preparational steps must be performed for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.
During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error?
There are 2 correct answers to this question.
Response:
You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.
You are performing an SAP S/4HANA conversion with DMO as an inplace migration. How does SUM transfer the data by default from the source database to the target database during the migration?
During the configuration of the DMO for SUM, which Migration Parameter selection is NOT possible for an inplace migration?
You are starting an SAP S/4HANA Conversion. The scenario strategy Downtime Optimized Conversion (DoC) is NOT selectable.What could be the reason?
Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question.
You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?
There are 2 correct answers to this question.
Response:
During a SUM run, you want to check if the PARCONV_UPG phase is still running properly. Where can you find information about this? Note: There are 2 correct answers to this question.
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:
What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correct answers to this question.
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:
During a SUM run you want to check if the phase SHADOW_IMPORT_INC is still running properly. Where can you find information about this?
There are 2 correct answers to this question.
Response:
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step "Configuration". For some software components you find entries in the "Calculated level" column.
What does the "Calculated level" indicate for those software components?
Please choose the correct answer.
Response:
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. What do you need to consider? Note: there are 2 correct answers to this question.
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
Please choose the correct answer.
Response:
You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist?
During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison?
Please choose the correct answer.
Response:
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
Response:
Which are valid options to check the progress of the database migration in a Microsoft Windows environment?
There is correct answers to this question.
Response:
You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?