Question 1

What is the benefit of using the UPGANA.XML file from a previous SUM run?

Options:

A.

To make the progress information within SUM UI more accurate

B.

To skip selected phases during the SUM run

C.

To repeat specific phases during the SUM run

D.

To auto-fill specific fields on selected screens on the SUM UI

Question 2

What is the name of the additional server that is used for a transition to SAP S/4HANA Cloud Private Edition?

Options:

A.

Migration Server

B.

Migration Hub

C.

Transition Server

D.

Central Instance

Question 3

You are performing an SAP S/4HANA conversion with DMO. You are using the downtime-optimized data conversion (DoC). Which steps can partially be moved to uptime processing? Note: There are 2 correctanswersto this question.

Options:

A.

Software update

B.

Main import

C.

Migration

D.

Conversion

Question 4

What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? Note: There are 2 correctanswersto this question.

Options:

A.

You need to build up an SI check framework by applying SAP Notes.

B.

The errors from the SI checks must be solved; otherwise, SUM will report an error.

C.

You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.

D.

The SI checks are executed in the development system and the results are transported into the subsequent systems.

Question 5

You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data?

Options:

A.

The end of the database migration

B.

The start of the Execution roadmap step

C.

The end of the business downtime

D.

The start of the business downtime

Question 6

What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?

Options:

A.

731

B.

700

C.

740

D.

750

Question 7

Which of the following are valid options to check the progress of an inplace SUM DMO run? Note: There are 2 correctanswersto this question.

Options:

A.

Check the dump size of the database export on disk.

B.

Check the log files written in the SUM directory, subdirectory abap, subdirectory log.

C.

Check logs for jobs starting with RSUPG_SGEN in the SAP system.

D.

Check the Charts Control Center in the SUM UI.

Question 8

You are performing an SAP S/4HANA conversion of the development system. Which credentials do you use, and in which system, to perform the adjustment of dictionary objects (SPDD)?

Options:

A.

Credentials of user DDIC in the development client of the development system

B.

Credentials of a named user in the development client of the development system

C.

Credentials of user DDIC in client 000 of the shadow system

D.

Credentials of a named user in client 000 of the shadow system

Question 9

You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correctanswersto this question.

Options:

A.

SAP S/4HANA conversion including database migration and Unicode conversion

B.

Unicode conversion SAP S/4HANA conversion including database migration

C.

Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migration SAP S/4HANA conversion without database migration

D.

Unicode conversion Database migration SAP S/4HANA conversion without database migration

Question 10

Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to SUM?

Options:

A.

Downtime conversion

B.

Downtime migration

C.

Shadow on target creation

D.

Silent data migration (SDM)

Question 11

You are performing an SAP S/4HANA conversion. Which phases are executed during SUM technical downtime? Note: There are 2 correctanswersto this question.

Options:

A.

TABIM_UPG

B.

PARDIST_SHD

C.

PARMVNT_UPG

D.

TABIM_SHADOW_*

Question 12

Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correctanswersto this question.

Options:

A.

DMO without system update

B.

SAP S/4HANA conversion without DMO

C.

Prerequisite check

D.

Benchmark tool

E.

SAP S/4HANA conversion including DMO