Question 1

Your business requirements demand production triggers.

Which of the following events in production can create an inspection lot(3 Correct Ans)

Options:

A.

Goods Movement

B.

Order Release

C.

Order Creation

D.

ATP check

E.

Dead line monitoring /batch monitoring

Question 2

A buyer wants to quality management department to approve a new vender malarial -combination.

After activating the QM in procurement process , what the quality management department ensure in......Correct 2

Options:

A.

The material master has an active inspection type

B.

A valid release quality info record exists

C.

The inspection plan includes a relevant control key at operation level

D.

The material master has a relevant QM Control key assigned to it

E.

A quality agreement for vendor master exists

Question 3

Your customer requires the lab to use quantitate characteristics during a production result recording. Which result confirmation control indicators are available for quantitative results

Options:

A.

Tolerance keys

B.

Mean value

C.

Summarized

D.

Single value

E.

Class confirmation

Question 4

In the material master, at which organizational level do you create Quality management (QM) data for inspection type.

Options:

A.

Company code level

B.

Plant level

C.

Business area level

D.

Client level

Question 5

You define a priority type in the implementation guide (img) and assign it to a notification type When you enter a priority during creation of notification, what can the system do?

Options:

A.

Create one or more task automatically

B.

Send one or more e-mails to involved partners

C.

Start workflow to inform the responsible person(s)

D.

Calculate the notification start and finish dates.

Question 6

The IMG includes a customizing activity in which you assign object categories to a notification type? Which of the following object category already exist in standard setting? (3 Correct Ans)

Options:

A.

Serial number

B.

Batch

C.

Purchase order item

D.

Material

E.

Order(pp-pi)

Question 7

Which of the following does the system automatically do when you complete a stability? Correct 3

Options:

A.

Set the system status to completed

B.

Lock the test schedule

C.

Set the usage decision for all stability inspection lots

D.

Lock all the storage conditions

E.

Trigger a subsequent stability Study

Question 8

Your customer record defects a characteristic level with in result recording and wants to correct all defects for each inspection.

How do you satisfy the customer requirement?

Options:

A.

In the implementation guide IMG select the active quality notification checkbox in the defect class for.....

B.

Use the same report type for all inspection operations

C.

Active defect recoding in the control indicators of the characteristics used in the inspection plan

D.

In the implementation guide, select the one Q-Notification per inspection type

Question 9

What is the difference audit between audit question and corrective preventive action? Correct 2

Options:

A.

Corrective actions have partners

B.

Audit questions have no status

C.

Audit question have no long texts

D.

Corrective actions have no search field

Question 10

The quality inspector records defects in results recording for a material inspection When creating notification the system determines the catalog profile by consulting objects in which of following sequences?

Options:

A.

Report type - Material - Notification Type

B.

Notification Type - report type - Material

C.

Material - Notification Type - report type

D.

Report type - Notification Type - Material

Question 11

Your customer wants to add the quality score of a material as criterion for the vendor evaluation Where do you set the calculation procedure for the quality score?

Options:

A.

Quality info record in procurement

B.

Vendor master

C.

Material master

D.

UD code

Question 12

Your customer plan to use Test Equipment Management as part of QM What event triggers the creation of an inspection lot for calibration inspection?

Options:

A.

Scheduling a maintenance plan

B.

Assignment of Equipment to a maintenance plan

C.

Creation of maintenance order