Spring Sale Limited Time Flat 70% Discount offer - Ends in 0d 00h 00m 00s - Coupon code: 70spcl

Pure Storage FlashArray-Implementation-Specialist Pure Certified FlashArray Implementation Specialist (FAIS) Exam Exam Practice Test

Pure Certified FlashArray Implementation Specialist (FAIS) Exam Questions and Answers

Question 1

A customer has ordered several FlashArrays and wants to have ActiveCluster configured. What is the maximum quantity of arrays supported with ActiveCluster?

Options:

A.

2

B.

3

C.

4

Question 2

An Implementation Engineer is setting up a customer environment and has specified a number of NTP servers. Which command should the Implementation Engineer run to list the NTP servers that have been configured?

Options:

A.

puredns list --ntpserver

B.

purenetwork list --ntpserver

C.

purearray list --ntpserver

Question 3

An Implementation Engineer is planning to add a DirectFlash Shelf to a FlashArray//XL with an existing DirectFlash Shelf. Which PCIe slot must be used for shelf connectivity?

Options:

A.

0

B.

4

C.

6

Question 4

What slot does a PCIe SAS card need to be installed in a FlashArray//XR2/3?

Options:

A.

0

B.

1

C.

2

Question 5

What is the required PSU wattage for a FlashArray// X70R2/R3 or X90R2/R3 array?

Options:

A.

1200W

B.

1300W

C.

1600W

Question 6

A FlashArray//XR2/3 has an Ethernet mezzanine (EMEZZ), what are the interface names of the ports on the mezzanine?

Options:

A.

ETH6, ETH7, ETH8, and ETH9

B.

ETH8, ETH9, ETH10, and ETH11

C.

ETH10, ETH11, ETH12, and ETH13

Question 7

What is the rack unit height of a FlashArray//XR2/3?

Options:

A.

3

B.

4

C.

5

Question 8

An Implementation Engineer has completed cabling a DirectFlash Shelf (DFS) to the FlashArray. Which command should the Implementation Engineer run to verify that the cabling was completed correctly?

Options:

A.

storage_view.py enclosures

B.

storage_view.py list

C.

storage_view.py config

Question 9

An Implementation Engineer is installing a FlashArray//XL chassis with two DirectFlash Shelves. What is the minimum rack space required for this installation?

Options:

A.

9U

B.

11U

C.

12U

Question 10

On a FlashArray//XR4, which port is enabled for the management service by default?

Options:

A.

ETH2

B.

ETH4

C.

ETH0

Question 11

If drives need to be relocated within an array for an XFORM upgrade, when should this be completed?

Options:

A.

During the upgrade

B.

After upgrade is completed

C.

The following day

Question 12

When installing the first DirectFlash Shelf on a FlashArray//XR2/3, what mezzanine ports are used on the controllers?

Options:

A.

ETH6 and ETH8

B.

ETH6 and ETH9

C.

ETH7 and ETH9

Question 13

When updating Purity on a new array, which command should the Implementation Engineer run to start the process?

Options:

A.

purereboot --install

B.

pureinstall

C.

puresetup

Question 14

A dark site customer requests an evacuation of SH01 on a FlashArray/M50. What is an appropriate next step?

Options:

A.

Use the evac_checks script.

B.

Ensure that usable capacity is less than 80%.

C.

Ensure that usable capacity is less than 90%.

Question 15

An Implementation Engineer is scheduled to install a FlashArray and a DirectFlash Shelf (DFS). What action should the Implementation Engineer perform?

Options:

A.

Refer to the “Recommended DFS Versions for Purity Releases” KB and upgrade Purity on the FlashArray and DFS.

B.

Install the Array and DFS with the Purity that shipped and have Support upgrade remotely.

C.

Only upgrade the Purity on the FlashArray and then attach the DFS.

Question 16

An Implementation Engineer is upgrading a FlashArray//X50R3 to an //X50R4. The array has 10 SAS and 10 DirectFlash modules in the chassis. What type of controller is required to complete the upgrade?

Options:

A.

FLASHARRAY//XC50 R4, SE

B.

FLASHARRAY//XC50 R4, NS

C.

FLASHARRAY//XC50 R4

Question 17

In a situation where iSCSI cards need to be re-used during a controller upgrade, which is a valid transfer path?

Options:

A.

XR2 > XR3

B.

M > XR2/3

C.

M > XR2

Question 18

An Implementation Engineer arrives on site to complete a shelf evac. What action must take place before Pure Support can run the completion commands?

Options:

A.

Enable Remote Assist (RA).

B.

Power off the shelf.

C.

Set maintenance tag.

Question 19

Prior to running the puresetup newarray command, which command should an Installation Engineer run on a new install of an //XR4 array?

Options:

A.

pureboot list

B.

cobalt_check.py

C.

purehw list

Question 20

Which Purity command can be used to validate I/O is balanced across initiators?

Options:

A.

purehost iobalance check

B.

purehost monitor --balance

C.

purehost list --balance

Question 21

What is the maximum number of DirectFlash Shelves supported for FlashArray//XL?

Options:

A.

2

B.

3

C.

4

Question 22

A customer would like to consolidate their SAS shelves and wants to evacuate multiple shelves in parallel. What is a prerequisite for this procedure?

Options:

A.

Purity must be upgraded to 6.x

B.

The array chassis must be fully populated with modules.

C.

The array usage percentage must be lower than 60%

Question 23

An Implementation Engineer performing an inventory of hardware for an NDU from an FlashArray//X70R2 to an FlashArray //X90R3 and discovers a complete FlashArray//X90R3 was shipped in place of an NDU kit. What is the minimum hardware the Implementation Engineer should use from this array to complete the NDU?

Options:

A.

Controllers

B.

Controller and power supplies

C.

Controller and NVRAM

Question 24

An Implementation Engineer needs to run the puresetup replace procedure on the FlashArray//X during a controller upgrade. Which command should the Implementation Engineer run on the new controller to determine its model?

Options:

A.

hwconfig --all

B.

hwconfig --model

C.

purearray list --controller

Question 25

What command should the Implementation Engineer run to configure a proxy?

Options:

A.

puresetup proxy https://yourproxyserver:1234

B.

purearray setattr --proxy https://yourproxyserver:1234

C.

purearray configure --proxy urlhttps://example.proxy.server

Question 26

What are the default replication ports on all three rack unit FlashArray models?

Options:

A.

ETH2 and ETH3

B.

ETH4 and ETH5

C.

ETH0 and ETH1

Question 27

Refer to the following output:

Ping successful with CCM

What does this indicate?

Options:

A.

Controller has successfully connected to pure1

B.

Controller has successfully connected to the Fusion Fleet Coordinator

C.

Cross-controller link has successfully connected between controllers

Question 28

Before proceeding with a controller upgrade, phonehome logs must be sent. What command will verify that the logs have been sent?

Options:

A.

purearray phonehome --check

B.

purearray phonehome --list

C.

purearray phonehome --status

Question 29

An Implementation Engineer runs check start validate-array-health before starting a FlashArray//X70R3 to FlashArray//X70R5 HWNDU and receives code 60 alert indicating an unhealthy NVRAM module in CH0.NVB1. What action Should the Implementation Engineer take to resolve this?

Options:

A.

Disable the unhealthy NVRAM module and proceed With HWNDU after confirming there is no degraded data.

B.

Reseat the unhealthy NVRAM module, and then verify it is in a healthy status prior to proceeding with the HWNDU.

C.

Proceed with the HWNDU, the //X70 model has a four NVRAM configuration so the array still has redundancy.

Question 30

On a FlashArray//X50 R2/R3 Fibre Channel (FC) array, what is the default type and placement of the PCIe FC card?

Options:

A.

2-port in slot 0

B.

2-port in slot 2

C.

4-port in slot 0

Question 31

After racking a new FlashArray with one data pack, how should DirectFlash modules be installed?

Options:

A.

Starting in bay 19, right to left.

B.

Starting in bay 0, left to right.

C.

Starting in bay 10, left to right.

Question 32

When accessing the FlashArray GUI, which management IP address is recommended for use?

Options:

A.

CT1 management IP

B.

CT0 management IP

C.

Virtual management IP

Question 33

A customer has a DirectFlash Shelf installed on a FlashArray//X90R4. The 208V rack PDUs are full, but there are five 120V connections available at the top of the rack. What should the Implementation Engineer understand about powering the DirectFlash Shelf in this scenario?

Options:

A.

The Shelf requires at least 180V to operate and Will NOT power on With 120V.

B.

The shelf can be fully supported by 120V for the duration of its service life.

C.

The shelf can operate temporarily on 120V, but 208/240V should be used as soon as it's available.

Question 34

An Implementation Engineer is going on site to complete a data pack evacuation and perform a hardware NDU. At what step should the Implementation Engineer contact support for assistance?

Options:

A.

After removing the fully evacuated drives before proceeding with the hardware NDU

B.

After removing the Old drives and inserting any new ones

C.

When the hardware NDU has been completed

Question 35

A customer wants to expand the capacity of their FlashArray//X10 from 5/5 to 11/11. Which is the correct action to take?

Options:

A.

Evacuate and swap one pack at a time.

B.

Perform a drive-by-drive swap of the modules.

C.

Install a swing shelf with loan capacity to evacuate to.

Question 36

During an intra-series upgrade from //XR3 to //XR4, which command should the Implementation Engineer run to verify host connectivity before removing the secondary controller?

Options:

A.

purehost list --hostless

B.

iobalance --sampletime 30

C.

host_connectivity --hosts

Question 37

An Implementation Engineer is deploying a FlashArray//XLR5 with two DirectFlash Shelves. The engineer wants to ensure the shelves are installed in the preferred PCIe slots to achieve optimal performance and support. Which PCIe slots should the Implementation Engineer use for connecting the DFS shelves?

Options:

A.

PCIe slot 1 for SH9, PCIe slot 7 for SH8

B.

PCIe slot 0 for SH8, PCIe slot 8 for SH9

C.

PCIe slot 0 for SH9, PCIe slot 6 for SH8

Question 38

An Implementation Engineer is performing a FlashArray//XR4 to FlashArray//XL upgrade, and is preparing to remove the XR4 CT0 controller. Which command should the Implementation Engineer run to stop Purity after confirming CT0 is the secondary controller?

Options:

A.

purewes controller disable --purity --verify-mode secondary --verify-array ARRAY_NAME ct0

B.

purewes controller disable --purity --verify-mode primary --verify-array ARRAY_NAME ct0

C.

purewes controller setattr --disable --verify-mode secondary --verify-array ARRAY_NAME ct0

Question 39

After completing an installation, the customer requests to configure replication IP settings. Where in the GUI does the customer need to navigate in order to do this?

Options:

A.

Settings > Network

B.

Storage > Replication

C.

Storage > Array Connections

Question 40

After running puredb run giveback --safe command once CT0 has been upgraded, how long should the Implementation Engineer wait before continuing with the controller upgrade?

Options:

A.

3 minutes

B.

5 minutes

C.

10 minutes

Question 41

For FlashArray//XL, which 2 PCIe slots should be used for DFS connectivity?

Options:

A.

0 and 4

B.

0 and 6

C.

1 and 7

Question 42

A customer needs to have arrays installed and configured with ActiveCluster and ETH replication. The installation document contains 3 IP addresses. How many additional IP addresses are needed?

Options:

A.

4

B.

5

C.

6

Question 43

In a situation where FC cards need to be re-used during a controller upgrade, which is a valid transfer path?

Options:

A.

M > XR2

B.

M > XR2/3

C.

XR2 > XR3

Question 44

After upgrading Purity during a new installation, which command should an Implementation Engineer run to determine what version of Purity will be loaded at the next boot of the FlashArray?

Options:

A.

purearray list --controller

B.

pureversion -a

C.

pureboot list

Question 45

Before leaving the site after an install, who is required to provide completion sign-off?

Options:

A.

Account team

B.

Customer

C.

Support

Question 46

On a FlashArray//XR20R2/3 Fibre Channel (FC) array, what is the default type and placement of the PCIe FC card?

Options:

A.

2-port in slot 0

B.

2-port in slot 2

C.

4-port in slot 0