Which action should an Implementation Engineer take to confirm that all volumes connected to a host are automatically in a protection group?
A customer would like to reduce SafeMode settings for retention and eradication with their current policy.
How is authorization obtained to make the requested changes?
A customer has a FlashArray X20R3 with 22/22 data packs in the chassis at 80% space usage and wishes to swap one of the data packs for a 45TB pack. What step needs to be taken to facilitate this consolidation?
What is the required PSU wattage for a FlashArray// X70R2/R3 or X90R2/R3 array?
A FlashArray arrives with Purity 5.3.8 applied out of the factory. The account team requests that the array configured with Purity 6.1.21. Which steps should the Implementation Engineer select to meet this requirement?
Which enablement feature will cause Mirrored Write statistics to appear in the Analysis section of the FlashArray Purity 6.x GUI?
What are the interface names for a 4-port FC card in slot 1 in an XR2/3 array?
When executing a FlashArray upgrade from the FA-405 to a FA-X Series, into which slot on CT1 must the 2 Port InfiniBand Card be installed?
Which I/O card type is compatible across all FlashArray models?
A customer has ordered several FlashArrays and wants to have ActiveCluster configured. What is the maximum quantity of arrays supported with ActiveCluster?
What is the maximum number of SAS shelves supported for FlashArray//XL?
If drives need to be relocated within an array for an XFORM upgrade, when should this be completed?
At the completion of an upgrade, which command is used to send phonehome logs?
The customer has completed the installation document and has stated that the proxy server address is “10.24.18.120”. What additional information is required?
What should an Implementation Engineer do when installing rails in a threaded-hole rack?
An Implementation Engineer performs a controller upgrade. What is the command to check I/O health?
An Implementation Engineer needs to run the puresetup replace procedure on the FlashArray//X during a controller upgrade.
Which command should the Implementation Engineer run on the new controller to determine its model?
An Implementation Engineer is assigned to install a 4X Module 9.1 TB Conversation Kit in a Flash Array Chassis. Why are there only four Direct Flash Modules?
An Implementation Engineer is scheduled to install a FlashArray and a DirectFlash Shelf (DFS).
What action should the Implementation Engineer perform?
In a situation where FC cards need to be re-used during a controller upgrade, which is a valid transfer path?
For FlashArray//XL, which PCIe card slot is reserved for control upgrades?
What is the minimum AC voltage required to operate a FlashArray//X20R4 array?