Weekend Sale Special Limited Time Flat 70% Discount offer - Ends in 0d 00h 00m 00s - Coupon code: 70spcl

Pure Storage FBAP_002 Pure Storage FlashBlade Certified Architect Professional (FBAP_002) Exam Exam Practice Test

Page: 1 / 8
Total 75 questions

Pure Storage FlashBlade Certified Architect Professional (FBAP_002) Exam Questions and Answers

Question 1

A customer is standing up a new 30x17TB FlashBlade system.

The customer’s environment is as follows:

1.The upstream switches are located 50 feet away

2.The upstream switches have the required number of 100Gb/s interfaces.

3.The customer is conscious about data availability.

4.The customer requires the use of 4 LAGs

What is the minimum number of cables required?

Options:

A.

4 passive QSFP + to QSFP + cables

B.

8 passive QSFP + to QSFP + cables

C.

4 active QSFP + to QSFP + cables

D.

8 active QSFP + to QSFP + cables ***

Question 2

A developer of a business-critical application is concerned about system reliability when it comes to a IO resistance. An architect needs to explain the FlashBlade write mechanism and address three main concerns:

-Data location when FlashBlade acknowledge a write

-Number of created data copies before FlashBlade acknowledges a write

-Blade failure resilience

When does write acknowledgement happen?

Options:

A.

When data is written onto Flash. ***

B.

When data is written NvRAM on three different blades.

C.

When data is written NvRAM on two different blades.

D.

When data is written NvRAM on a super capacitor.

Question 3

What must an architect do to delete a filesystem?

Options:

A.

Unmount the file system from clients

B.

Turn off the system services

C.

Enable Fast Remove ***

D.

Take a snapshot and then remove file system

Question 4

A customer is a heavy Windows user and generally uses SMB for everything, including backups. The customer wants to refresh the storage used within their backup environment. The customer is using Commvault for the backup software.

Which protocol should the architect recommend?

Options:

A.

SMB ***

B.

NDMP ***

C.

S3

D.

NFS

Question 5

A customer practices agile development, and they are having performance issues with builds of the most actively developed software suite as they attempt additional concurrent builds. What is causing the issue?

Options:

A.

Locking of shared library files during compilations.

B.

Latency between the compilation server and the legacy storage. ***

C.

Jumbo frames are NOT configured correctly.

D.

Legacy storage does NOT have enough uplinks.

Question 6

A customer has an existing Flashblade with 13x52TB blades in a single-chassis configuration and needs more capacity for a new application coming online in the next few weeks. The architect has determined they need an additional four blades.

How many additional rack units are required to accommodate the new blades?

Options:

A.

12

B.

10

C.

6

D.

4 ***

Question 7

A customer is adding snapshot policies so that some file systems can be tiered based on importance to the business.

-1 file system with high priority

-3 file systems with medium priority

-2 file systems with low priority

How many snapshot policies does the customer need to protect all of their file systems?

Options:

A.

3 ***

B.

1

C.

6

D.

4

Question 8

Question # 8

A customer provides a diagram and reports no complaints about backup completion times. The customer is concerned about the complexity of the environment.

What is the illustrated pain point?

Options:

A.

Siloing

B.

Throughput***

C.

Latency

D.

Security

Question 9

What is the maximum file size that is supported by the FlashBlade?

Options:

A.

32TiB

B.

64TiB ***

C.

70TiB

D.

84TiB

Question 10

A FlashBlade is designed with a properly implemented single 4x40Gb/s LAG.

During implementation, the architect is informed that the ISL on the uplink switches in broken. The customer has no budget to repair or replace it. What should the architect do?

Options:

A.

Divide the single LAG into one LAG per switch. ***

B.

Change out the 40Gb/s cable for breakout cable.

C.

Using the same LAG, create a second subnet and VIP.

D.

Remove all uplink from FM2.

Question 11

A customer wants to leverage FlashBlade to create a DataHub. Which set of applications will co-exist on a FlashBlade DataHub?

Options:

A.

CommVault, Veeam, NetBackup, VDI, SAP

B.

AI/ML, Kafka, Spark, Oracle OLTP, SAP

C.

SAS, Elastic Search, Kafka, Spark, Veeam ***

D.

Oracle OLTP, Elastic Search, Kafka, Spark, Veeam

Page: 1 / 8
Total 75 questions