Question 1

You want to ensure that the Physical Mapping Design cannot be modified even if the Logical Design of the Mapping is changed. What sequence of steps must you follow to achieve this? (Choose the best answer)

Options:

A.

Go to the Physical tab, select theFixedDesign check boxof the Physical Mapping Design.

B.

Go to the Physical tab, select the Is Frozen check box of the Physical Mapping Design.

C.

Go to the Physical tab, select the Read-only check box of the Physical Mapping Design.

D.

Go to the Physical tab, deselect theModify check boxof the Physical Mapping Design.

Question 2

How are the ODI repositories upgraded? (Choose the best answer.)

Options:

A.

by using Opatch

B.

by using ODI Studio

C.

by using the import/export utilities

D.

by using Upgrade Assistant

Question 3

A Mapping that uses CDC does not load any source data and you want to check the SNP_CDC_SET table to find out the current window ID.

In which database schema must you look to find this table? (Choose the best answer.)

Options:

A.

the schema hosting the Work repository

B.

the schema hosting theWork schema of the default schema defined for your source data server

C.

the schema hosting the Staging Area

D.

SYS

Question 4

Which statement is true about the need to have a topology with an intermediate server, in order to use ODI correctly in a data warehouse project? (Choose the best answer.)

Options:

A.

Data transformation must be distributed across several scalable nodes.

B.

It is mandatory to have an intermediate server.

C.

It is better to load data directly from sources into a data warehouse server.

D.

It is mandatory to collect data directly from sources to a data warehouse server by using real time replication processes.

Question 5

You need to create a package that automatically sends an alert to users in case the third step fails.

Which option represents the steps to accomplish this? (Choose the best answer.)

Options:

A.

Add anOdiSendMailstep to My Package and link the My Third Package step to it by using a green OK arrow.

B.

Add anOdiSendMailstep to My Package and link the My Last Package step to it by using a red KO arrow.

C.

Add anOdiReadMailstep to My Package and link the My Third Package step to it by using a red KO arrow.

D.

Add anOdiSendMailstep to My Package and link the My Third Package step to it by using a red KO arrow.

Question 6

You are a project developer using ODI and want to consolidate your own local metadata repositories. Identify the true statement. (Choose the best answer.)

Options:

A.

You must consolidate your own local metadata repositories. The local metadata must be transmitted via ftp and synchronized with a dedicated proprietary engine, creating a common metadata model for all the developers.

B.

You must consolidate your own local metadata repositories. You have to invoke a dedicated web service to synchronize the metadata by using Oracle Service Bus.

C.

You need not consolidate your own local metadata repositories, because the ODI proprietary metadata server allows all developers to share the common metadata of a specific project.

D.

You need not consolidate yourown local metadata repositories, because ODI uses a centralized relational metadata repository that all the developers share.

Question 7

How does the data flow when moving records between two servers by using Database Links and an Agent installed on a middle-tier server? (Choose the best answer.)

Options:

A.

from the source database into flat files that are then loaded into the target database

B.

directly from the source database to the target database

C.

from the source database onto the server running the Agent and then into the target database

D.

from the source database into the machine running ODI Studio and then into the target database

Question 8

You need to create a Model that works with multiple underlying technologies. How must you proceed? (Choose the best answer.)

Options:

A.

This works only for Oracle and Informix.

B.

This works only for Oracle and MySQL.

C.

Create a new generic technology to support it.

D.

Use the out-ofthe box Generic SQL technology.

Question 9

When Oracle Data Integrator (ODI) and Oracle GoldenGate are used together, which option represents the phases of an ELT process that Oracle GoldenGate performs? (Choose the best answer.)

Options:

A.

transform only

B.

load and transform

C.

extract and load

D.

extract and transform

Question 10

You have been tasked with designing a Mapping that must perform an initial load and incremental updates using the same transformation logic. How should you proceed? (Choose the best answer.)

Options:

A.

Create a single Mapping with two Physical Designs: one for theinitialload and one for the incremental updates.

B.

Create a single Mapping with a single Physical Design and modify it appropriately when an initial load is required or when an incremental update is required.

C.

Create two Mappings: one for the initial load and one for the incremental updates. Duplicate the transformation logic.

D.

Create a single Mapping and use variables in the Logical Design to do an initial load when required or an incremental update otherwise.

Question 11

You want to modify the code generated by a failed Task and restart the session. How must you proceed? (Choose the best answer.)

Options:

A.

Open the Task in Operator, go to Code, click Edit, use Pre-execution Code to edit the code, and save it.

B.

It is not possible to modify the code once it has been generated.

C.

Open the Step in Operator, edit the code, and save it.

D.

Open the Task in Operator, go to Code, click Query/Execution Plan to edit the code, and save it.