Refer to the exhibit by clicking on the EXHIBIT button above.

Given: The connections between the glulam beam and CLT panels all require a fire-resistance rating of 2 hours, and wood cover is designed per AWC Technical Report 10 to provide the entire 2 hours of protection.
The bearing area between the CLT and glulam is the minimum required.
What are the minimum dimensions, in inches, for the wood block shown in red?
Each of the following is true regarding the fire-resistance rating for exterior bearing walls except:
The building owner shall be responsible for each of the following for fire safety during construction except:
Periodic special inspection of sealants or adhesives shall be conducted where sealants or adhesives are part of a mass timber building element as designated in the approved construction documents.
All of the following statements are correct in reference to sealants or adhesives in mass timber buildings except:
Combustible construction forming concealed spaces shall be protected with noncombustible protection with an assigned time of 40 minutes in which construction type?
Refer to the figure by clicking on the EXHIBIT button above.


In Type IV-B construction, unprotected portions of mass timber as shown in the Figure are required to be separated by _____ feet.
One code-recognized method for calculating the fire-resistance rating of exposed wood members and decking is:
Which of the following is an acceptable alternative for protecting structural connections from fire in Type IV-A, IV-B or IV-C construction?
Where Type X gypsum board serves as noncombustible protection for interior surfaces of wall and ceiling assemblies, all of the following code provisions are correct except:
Refer to the figure by clicking on the EXHIBIT button above.


In Type IV-B construction, based on a 900 sq. ft. floor area, a 30 ' room width, and a 12 in. x 18 in. beam as shown in the Figure, the maximum length of the unprotected portion of the mass timber ceiling (dimension X) is _____ feet.
Fire-resistance ratings of members and assemblies can be established by all of the following except:
Mass timber is allowed in which of the following International Building Code Construction Types?
Refer to the exhibit by clicking on the EXHIBIT button above.

In the detail shown and according to AWC Technical Report 10, what is the time assigned in minutes to 5/8 in. Type X gypsum board for connection fire protection thermal separation requirements?
In Type IV-C construction, the fire-resistance rating provided by protection over a connection can be determined by which of the following?
Regarding water supply for the protection of buildings under construction, when combustible building materials of the building under construction are delivered to a site, the minimum fire flow provided shall be _____ gpm.
Refer to the figure by clicking on the EXHIBIT button above.


In Type IV-B construction, unprotected portions of mass timber as shown in the Figure is limited to an area equal to not more than what percentage of the base floor area?
Periodic special inspection of sealants or adhesives as specified by the International Building Code Section 703.7 shall be conducted at which of the following locations?
Refer to the figure by clicking on the EXHIBIT button above.


In Type IV-B construction, unprotected portions of mass timber as shown in the Figure is limited to an area equal to not more than what percentage of the base floor area?
Which of the following requires continuous special inspection?
Refer to the exhibit by clicking on the EXHIBIT button above.

In the detail shown, if the connections between the glulam beam and CLT panels all require a fire-resistance rating of one (1) hour and the wood cover is designed per AWC Technical Report 10 to provide the entire 1 hour of protection, what is the minimum thickness and number of layers required for the locations shown in red?
Which of the following provisions for mass timber used for interior exit and elevator hoistway enclosures is true?
The fire-resistance of a protected mass timber assembly is equivalent to the fire resistance time of the:
The fire-resistance of a protected mass timber assembly is equivalent to the fire resistance time of the:
According to UL Fire Resistance Directory, a “finish rating” is the time: