Question 1

ECO mode is not recommended when the load is less than

Options:

A.

10%

B.

30%

C.

5%

D.

20%

Question 2

After the unit is powered on for the first time, it enters the compressor preheating state. To quickly perform power-on commissioning, you can manually shut down the compressor preheating.

Options:

A.

True

B.

False

Question 3

The FusionCol8000-A230 unit uses two systems. Each system uses three compressors connected in parallel and two EEVs.

Options:

A.

True

B.

False

Question 4

After replacing the fan, choose "Menu > _____ > Performance Maintenance" on the main screen to enter the "Performance Maintenance" screen and clear the accumulated runtime of the indoor fan.

Options:

A.

Alarms

B.

Settings

C.

Running

D.

Maint

Question 5

Which of the following statements are true?

Options:

A.

When the UPS works in normal mode, you can directly turn on the maintenance bypass switch.

B.

When the UPS works in static bypass mode, if the mains input outage occurs suddenly, the UPS automatically switches to battery mode.

C.

Huawei UPS5000-H is a modular UPS. If a module fails, it can be replaced online.

D.

When mains and bypass input of the UPSs share one power source, if mains outage occurs, the UPS cannot work in bypass mode.

Question 6

If the startup password authentication for a smart module is not complete, the ECC800-Pro WebUI and app cannot be used for commissioning.

Options:

A.

True

B.

False

Question 7

The frequency of power supply equipment can be 50 Hz, 60 Hz, or 70 Hz.

Options:

A.

True

B.

False

Question 8

The NetEco can be deployed on any virtualization platform.

Options:

A.

True

B.

False

Question 9

What are the colors of indicators on the LCD panel of the MDU?

Options:

A.

Yellow

B.

Green

C.

Red

D.

Orange

Question 10

Which of the following can be used to start the inverter of the UPS5000-H?

Options:

A.

UPS WebUI

B.

ECC

C.

UPS LCD

D.

NetEco

Question 11

Video management can connect to the third-party video surveillance subsystem and play historical videos.

Options:

A.

True

B.

False

Question 12

When a critical alarm is generated in a lithium battery cabinet and the buzzer beeps continuously, the status of the indicator on the MDU is

Options:

A.

Blinking yellow fast

B.

Steady yellow

C.

Blinking red fast

D.

Steady red

Question 13

Huawei-developed intelligent rPDU (PDU2000M) can replace the original UIM20A expansion module. The rPDU can connect to the cabinet temperature/humidity sensors, smart U space managers, and door status sensors.

Options:

A.

True

B.

False

Question 14

On the ECC800-Pro WebUI, the PUE configuration mode can be "Standard" or "User-defined".

Options:

A.

True

B.

False

Question 15

Which of the following control modes can be used for temperature and humidity control of smart cooling products?

Options:

A.

Cold aisle

B.

Supply air

C.

Return air

D.

Hot aisle

Question 16

Which of the following interfaces is used to connect the controller and the main control module of the unit?

Options:

A.

DP

B.

USB

C.

SW

D.

I2C/12v

Question 17

The rated output capability of a single power module for the UPS5000-H is how many kVA.

Options:

A.

50

B.

100

C.

30

D.

60

Question 18

Which of the following statements is false about the advantages of the free cooling solution for data centers?

Options:

A.

The current technology is not mature enough and should be used with caution.

B.

Has many use cases in the industry.

C.

Directly uses the cooling capacity of the outdoor cooling source, resulting in ultra-low energy consumption.

D.