Question 1

After creating a quotation, you can configure its basic information, including the quotation name, BOQ type, local office, and remarks.

Options:

A.

True

B.

False

Question 2

Which of the following is included among the service configuration types offered by Meta CPQ?

Options:

A.

Maintenance service

B.

Implementation service

C.

Supervision service

D.

All of the above

Question 3

FusionDC1000A-40ft includes ASD early smoke detection as a standard feature.

Options:

A.

True

B.

False

Question 4

After a BOQ is created, you can promptly set its basic information, such as the BOQ name, BOQ type, office, and remarks.

Options:

A.

True

B.

False

Question 5

The project delivery site must have suitable fire-extinguishing facilities. A complete emergency plan must be prepared before the project begins. An emergency drill must be completed before the project is formally handed over.

Options:

A.

True

B.

False

Question 6

FusionModule500 includes an integrated fire-suppression module that is 1U high and uses perfluorohexanone (PFH) extinguishing gas.

Options:

A.

True

B.

False

Question 7

Which systems are prefabricated and integrated into the FusionDC1000A-40ft?

Select All that Apply.

Options:

A.

Rack

B.

Cooling

C.

Power

D.

Fire Protection

E.

Management

Question 8

Which of the following is not a business type offered by Meta CPQ?

Options:

A.

Commerce application

B.

Draft

C.

Project archiving

D.

Contract/PO

Question 9

FusionDC1000A-40ft supports a maximum IT power of 50 kW.

Options:

A.

True

B.

False

Question 10

The FusionModule800 front door uses a double-layer glass door. Which of the following functions can it provide?

Select All that Apply.

Options:

A.

Separate hot and cold air

B.

Provide greater structural strength

C.

Reduce noise

Question 11

FusionDC1000A meets GR-63-CORE Zone 3 anti-seismic performance.

Options:

A.

True

B.

False

Question 12

Which of the following are features of the UPS2000-H in FusionModule800?

Select All that Apply.

Options:

A.

Strong load adaptability, output PF=1

B.

The system has high conversion efficiency, reaching up to 96%

C.

Fast upgrade and maintenance, with remote online monitoring and upgrades

D.

Wide input voltage range, 80V to 280V

Question 13

In FusionModule2000, what benefits do intelligent busbars provide compared with conventional end-of-suite solutions?

Select All that Apply.

Options:

A.

Supports flexible expansion

B.

Increase available cabinet space

C.

Low power distribution loss

D.

Easy to install

Question 14

Which of the following are commonly used types of PPE at a construction site?

Select All that Apply.

Options:

A.

Protective gloves/insulated gloves

B.

Insulated shoes/protective shoes

C.

Protective glasses/protective masks

D.

Safety helmet

E.

Protective clothing/reflective vest

Question 15

In the FusionDC1000A-40ft N+X scenario, the UPS supports two ATS inputs and has a maximum power capacity of 60 kVA (with 2+0 redundancy).

Options:

A.

True

B.

False

Question 16

Which of the following operations must be completed when applying for an account and permission for SCT?

Select All that Apply.

Options:

A.

Select permissions

B.

Register and activate a Huawei uniportal account

C.

Associate your account with your company's account

Question 17

FusionDC1000A's anti-seismic rating reaches _____.

Options:

A.

9

B.

10

C.

12

D.

11

Question 18

Which of the following is not a recommended display range on the Configuration Result tab page?

Options:

A.

Quantity = 0

B.

Quantity > 0

C.

Quantity > 0 + Manual modification

D.

Manual modification

Question 19

The FusionModule500 uses the typical configuration mode, with core components preinstalled at the factory. How long does it take to roll out services on site?

Options:

A.

2 days

B.

1 day

C.

4 hours

D.

3 days

Question 20

In the FusionDC1000A-40ft-IT solution, cold and hot aisles are present between cabinets in the equipment area of the prefabricated module. The sliding door seals an aisle, creating hot-aisle containment.

Options:

A.

True

B.

False

Question 21

Crosby introduced the zero-defect (ZD) concept.

Options:

A.

True

B.

False

Question 22

Which of the following roles are included in the SQA LBPGP role model?

Select All that Apply.

Options:

A.

Continuous improvement pusher

B.

Safety and quality requirement practitioner

C.

Safety and quality culture builder

D.

Safety and quality result guardian

Question 23

Which of the following methods does SCT provide for transferring quotations?

Select All that Apply.

Options:

A.

Submitting quotations

B.

Exporting quotations

C.

Sharing quotations

Question 24

The SCT is a fast, smart, and simple online tool that makes configuration and quotation easier.

Options:

A.

True

B.

False

Question 25

Which two FusionModule800 configurations support optional continuous cooling?

Select All that Apply.

Options:

A.

BC4L

B.

BC1L

C.

BC3L

D.

BC2L

Question 26

Which of the following BOQ types may be used to place orders for demo products in SCT?

Options:

A.

Demo BOQ

B.

Promotional BOQ

C.

Normal BOQ

Question 27

The lithium-battery version of FusionDC1000A-40ft-IT is equipped with __________ IT racks in an N+X configuration.

Options:

A.

8

B.

7

C.

10

D.

9

Question 28

After obtaining the total product volume and weight details in the Meta CPQ BOQ, to which of the following businesses can the BOQ be submitted?

Options:

A.

Logistics goods volume estimation

B.

Draft

C.

Commerce application

D.

Manual review (exporting databases)

Question 29

FusionModule500 is intended for small-scale outlets or mini DCs. Its IT load is low. Therefore, FusionModule500 has no cooling unit.

Options:

A.

True

B.

False

Question 30

To obtain total product volume and weight details for the SCT BOQ, to which business can you submit the BOQ?

Options:

A.

Logistics Estimation

B.

SPQ

C.

Manual Review (Export DB)

D.

Service Compliance

Question 31

According to the training materials, construction-site safety management can be classified into __________.

Select All that Apply.

Options:

A.

Safety technology management

B.

Site and facility management

C.

Safety organization management

D.

Behavior control

Page: 1 / 11