Redeem Your Black Friday Code: 75% Off All Exam Bundles! Use coupon code below! - Ends in 0d 00h 00m 00s - Coupon code: discactive

CIPS L6M8 Innovation in Procurement and Supply Exam Practice Test

Page: 1 / 12
Total 120 questions

Innovation in Procurement and Supply Questions and Answers

Question 1

TGY Ltd is a manufacturing organisation which produces five major components for use in the transport sector. Each component is produced by a different Project Team. Below are details of the five projects.

Project 1: The team are looking at where the material originates and how much of this natural resource is left in the ground.

Project 2: The team are focused on what happens when the product is no longer required by the customer and whether the product can be repurposed to save it going to landfill.

Project 3: The team are keen to ensure the customer is happy with the product and that it meets safety standards. The focus of the Life Cycle Analysis is on what happens inside the factory.

Project 4: The team are looking at the longevity of the item once purchased by the customer.

Project 5: The team are exploring the additional overhead costs associated with the production of the item and the way in which the item is produced.

Complete the table below by listing the area of life cycle analysis being looked at, and the area of the Balanced Scorecard this relates to (some options may be used twice); energy consumption, use, disassembly, extraction, manufacturing, transportation, sustainability x2, quality, environment, value for money, processes.

Which of the following will you put into box 3?

Options:

A.

energy consumption

B.

use

C.

disassembly

D.

extraction

E.

manufacturing

F.

transportation

Question 2

This system integrates finance, resources and logistics. What is it?

Options:

A.

RRP

B.

BRP

C.

MRP

D.

ERP

Question 3

Design for Disassembly includes which three features?

Options:

A.

selecting suppliers based on their environmental standards

B.

upcycling products

C.

choosing materials that can be recycled

D.

labelling materials

E.

choosing fastenings which can be easily undone

Question 4

Pentagon Services have a partnership type of relationship with their main supplier and introduced a Joint Performance Appraisal scheme for a new venture which they are embarking on together. This process includes an ' open-loop feedback ' mechanism, what will this aid?

Options:

A.

reduces the need for in person meetings

B.

flexibility in launching the new venture

C.

cost savings

D.

organisational learning

Question 5

Below are details of five companies who all have different types of relationships with their suppliers. For each company, select the corresponding relationship type and the main relationship- influencing KPI monitored by the company.

Company 1: The relationship is characterised by high levels of conflict, but is one in which there is mutual respect for each other’s ideas and innovative solutions are often formed from the conflict. This KPI is measured by the level of information sharing between the buyer and supplier and the level of reliability of both parties.

Company 2: There is a low level of co-operation between Company 2 and its main supplier. The contract is not expected to last much longer due to conflicts that cannot be resolved amicably. There is a low level of dependency on the supplier and a number of alternative providers in the marketplace.

Company 3: The relationship is characterised by a win-win approach and both parties consider themselves equal. The relationship is measured based on its openness, honesty and levels of information sharing, particularly in the disclosure of sensitive information.

Company 4: Company 4 works well with their supplier and there is little conflict. The relationship is important due to the high value of the contract and the two parties work together to meet the same goals. The KPI measures the exchanges and levels of collaboration between the parties.

Company 5: The supplier does not place much importance on the relationship with Company 5 due to the low value of the contract. Company 5 is worried that the supplier is not willing to invest in the contract and therefore are measuring the loyalty of the supplier as a KPI.

Complete the table below with the correct relationship type and relationship influencing KPI: nice, creative, marginal, hostile, partnership arm’s length, power, trust, co-operation, communication, commitment, transparency.

Which of the following will you put into box 5?

Options:

A.

nice

B.

creative

C.

marginal

D.

hostile

E.

partnership

F.

arm ' s-length

Question 6

Swift Manufacturing is currently seeking new suppliers to create a new product that will be launched next year. They are keen to enter a new market and expand their customer base and ensure the new product provides value for money to the customer. The procurement department is currently conducting market research which will inform upon possible designs for the new product.

Simultaneously they are also speaking with suppliers regarding the specification. Swift Manufacturing are keen to ensure the new product is as environmentally friendly as possible, so are researching different raw materials that can be used and their impact upon the environment.

When designing the tender process, Swift Manufacturing would like the successful supplier to have an environmental management system in place and will incorporate this as part of the ‘essential criteria’ of the specification and tested on the PQQ stage of the tender.

It is important for the CEO of Swift Manufacturing that the supplier hits the ground running on this contract as soon as it is signed, given the importance of the new product to the organisation’s competitive advantage strategy. He is therefore keen to ensure that the procurement department include strict performance targets within the contract.

What stage of product design is the procurement team currently at?

Options:

A.

idea generation

B.

prototype design

C.

market segmentation

D.

business process re-engineering

Question 7

In which e-auction process does the price start high and is gradually reduced until a bid is received?

Options:

A.

English Bid Process

B.

Reverse-bid Auction

C.

Dutch Bid Process

D.

Sealed Bids

Question 8

An ' Enterprise Service Bus ' is an example of which of the following, which is a tool that may be used by the procurement professional?

Options:

A.

system integration tool

B.

data analytics tool

C.

e-procurement tool

D.

forecasting tool

Page: 1 / 12
Total 120 questions